Categories
D8098

D8098 Locomotive News – August 2019

4th August Another session for some of the T1LC engineering staff looking at the speedometer system on D8098, which showed issue’s during the loaded test run last week. We found that there was alot of water in the wheel wear compensater unit, this has been stripped down, dried, cleaned out and repairs carried out. We… Read More